Skip to content

Intersections At The JT Deposit In Alaska

Intersections At The JT Deposit In Alaska

VANCOUVER – HighGold Mining Inc. reported results for the first drill hole of the 2021 Field Season from expansion drilling at its flagship 0.75 million ounce 10.9 g/t gold equivalent (AuEq) Johnson Tract polymetallic Gold Project in Southcentral Alaska. Drillhole JT21-123 was designed to test along strike and down-plunge from the JT Deposit as a nominal 100-meter step-out from last years expansion drilling on the northeast side of the deposit. High-grade mineralization was successfully intersected in hole JT21-123, building on the success of the 2020 drill program and extending the total strike length to 600 meters. Drill Highlights – JT Deposit Expansion (JT21-123): 13.1 g/t Au, 200 g/t Ag, 4.92% Zn, 2.04% Pb, and 0.35% Cu (20 g/t AuEq) over 4.3m including 19.0 g/t Au, 242 g/t Ag, 7.10% Zn, 2.91% Pb, and 0.50% Cu (28 g/t AuEq) over 2.8m.

“This is a great start to the 2021 drill program,” said, President and CEO Darwin Green. “Our first drill hole of the season has intersected strong precious and base metal mineralization in a large step-out from last years drilling, expanding the total strike length of JT Deposit mineralization by 15-20% to 600 meters. In addition to the excellent gold grades, the intersection includes some of the highest silver grades documented to date at the JT Deposit and is developed within a mudstone host – features often found in gold-rich VMS deposits. We are already designing follow-up holes and are excited to see how this new variation in the mineralization style at the JT Deposit develops as we continue to test at depth and along strike.”

Comments (0)

Leave a Reply

Your email address will not be published. Required fields are marked *

Back To Top