Results And 2010 Production Guidance VANCOUVER, BC - Paul Blythe, President and CEO…
Drilling Intersects 84.7 g/t Silver At Reese River
Drilling Intersects 84.7 g/t Silver At
Drilling was funded by International Minerals Corporation, which is earning an initial 60% interest in the project. The project is managed by New Dimension. The majority of drilling was conducted at
Highlights of the program include an intersection in RR#6 grading 84.7 g/t silver over 4.6 metres that occurs within a 13.7 metre intercept grading 36.8 g/t silver.
This drill-hole was the only one that successfully reached the faulted contact between intrusive rocks and the overlying sediment, which the Company has proposed as the main conduit for
The company’s address is
Comments (0)